Name: EGGINGTON MANOR FARM
Project details: 4.99MWp Ground Mounted System
The park, built in the village of Leighton Buzzard, in the Bedfordshire County during the 2015 using a ground mounted system, delivers a power of 4.99MWp.
Renergy Power Plants was commissioned of the full design package and the sub-contracting management, delivering the complete construction, civil, mechanical and electrical, proven by cold commissioning test, of the park, managing the materials supply and the logistic of the site.
SCOPE OF WORK:
- Full design package
- Civil, Mechanical and Electrical Installation
- Sub-Contracting management
- Cold Commissioning
-
2015
-
Engineering
-
Construction
-
Leighton Buzzard, Bedfordshire, UK