Name: GATAIA
Project details: 2.99MWp Biaxial Tracked System
The park, built in the village of Gataia, in the Timis County during the 2016 using a biaxial tracked system, delivers a total power of 2.99MWp.
Renergy Power Plants was commissioned of the mechanical and electrical installation.
SCOPE OF WORK:
- Mechanical and Electrical installation
-
2016
-
Construction
-
Gataia, Timis, Romania